|
| |
| The installation involves two cuts (Installation Template & Cutting Blade would be supplied in packaging,) on the existing leader downspout pipe. The upper and lower Adapters are then fitted into the openings & subsequently secured by supplied screws. The LEEDER METER is then inserted between the two adapters.We have attached some photos of the LEEDER METER for you reference. |
| |
 |
|
 |
|
 |
|
 |
|
 |
|